Division Street Bridge: Video Update

pic of Div Street bridge removal

The Division Street bridge project is moving along, and below are two videos showing progress below.

The time lapse version, the linked in first image below, is about two minutes; the real-time version, at the bottom of the page, about 10 minutes.

The town's engineering firm, Tighe & Bond, captured two videos showing the removal of the old span.

The old bridge is being removed so that a temporary replacement span can be put in place, to reopen traffic on Division.

Time lapse:

Div St Bridge Time Lapse Pic

Real time:

division st bridge video slo